Number Title Category Status Year
ND 91-01 Base Reinforcement Using Geogrid Geotextile Completed 1991
ND 91-03 3M's Stamark Pliant Polymer Pavement Marking Tape, A380 Pavement Markings Completed 1991
ND 91-04 Silane and Hot Bituminous Overlay as a Treatment for "D" Cracking on PCC Pavement Treatments Completed 1991
ND 92-02 Stratagrid's A-100 Ability to Strengthen an Asphalt Overlay Asphalt Completed 1992
ND 92-03 Road Condition Weather Monitor Maintenance Completed 1992
ND 92-05 Permeable Asphalt Stabilized Base Beneath an Asphalt Pavement Asphalt Completed 1992
ND 94-01 Saw and Seal Over the Overlaid Existing Concrete Joints Asphalt Completed 1994
ND 94-02 Paveprep Inter Layer to Halt or Retard Reflective Cracking Asphalt Completed 1994
ND 94-05 Moisture Sensors in Base and Sub-base Soils Completed 1994
ND 94-07 Optical Camera in Edge Drains Miscellaneous Completed 1994
ND 94-08 Silicone Versus Preformed Compression Joint Seals for Concrete Pavement Concrete Completed 1994
ND 94-09 Evaluation of Tining Widths to Reduce Noise of Concrete Roadways Concrete Completed 1994
ND 94-12 Polycarb's Mark-55 Series Epoxy Pavement Marking Pavement Markings Completed 1994
ND 95-02 Crushed PCC Material as a Drainable Base Base Completed 1995
ND 95-03 Dowel Bar Retrofit for Load Transfer Concrete Completed 1995
ND 96-01 Wasser Single Component Moisture Cured Paint for Bridge Maint. Overcoating Bridge Completed 1996
ND 96-02 Soil Guard Bonded Fiber Matrix for Erosion Control Soils Completed 1996
ND 96-03 Modified Chip Seal Surface Treatments Pavement Treatments Completed 1996
ND 96-04 Evaluation of Crafco Crack Sealants on Asphalt Pavements Pavement Treatments Completed 1996
ND 97-01 Whitetopping an Existing Asphalt Pavement with Polyolefin Fiber Enriched PCC Concrete Completed 1997
ND 97-02 Evaluation of an Experimental Portland Cement Concrete Pavement Project Concrete Completed 1997
ND 97-03 Performance of Different Classes of Hot Bituminous Pavement Asphalt Completed 1997
ND 98-01 Portland Cement as a Rehab Option for Overlaying an Existing Asphalt Roadway Concrete Completed 1998
ND 98-02 Snow Management by Use of Snow Fence Systems Miscellaneous Completed 1998
ND 98-03 Vegetation Barriers Around Headwalls of Edge Drains Miscellaneous Completed 1998
ND 98-04 Use of Snow Plowable, Reflective Pavement Markers for Effective Delineation Pavement Markings Completed 1998
ND 98-05 Saw & Sealing Joints in Bituminous Pavement Asphalt Completed 1998
ND 98-06 Fabric Reinforced Backfill Under Approach Slabs Bridge Completed 1998
ND 99-02 Tining Versus Carpet Dragging for Texturing PCC Pavements Concrete Active 1999
NDSU 00-01 Design of a High-Performance Concrete Mix for use in Dowel Bar Retrofit University Research Completed 2000
NDSU 01-01 Cost Effective Non-Flammable Pipe Liners University Research Completed 2001
NDSU 08-01 Use of Thermal Camera During Asphalt Pavement Construction University Research Completed 2008
NDSU 11-01 Warm Mix Asphalt Processes Applicable to North Dakota University Research Completed 2011
NDSU 11-02 Field Investigation of Warm Mix Asphalt Temperatures University Research Completed 2011
NDSU 13-01 Asphalt Pavement Thermal Crack Maintenance Best Management Practice Asphalt Completed 2013
NDSU 13-02 Survey/Literature Review of Fast-Track PCC Pvmnt Repair Process and Materials Concrete Completed 2013
NDSU 17-01 Heated Pavement Marking System by Conductive, Fly Ash-Based Geopolymer Concrete University Research Completed 2017
UND 02-02 Effects of Water Reducer Admixtures on Concrete Strength and Durability University Research Completed 2002
UND 02-03 Cold in-Place Recycling of Asphalt Pavements in the Northern Plains Region University Research Completed 2002
UND 03-01 Low Permeable Concrete Bridge Deck University Research Completed 2003