Please clarify 230-P01. The note requires reshaping the embankment to a 4:1 minimum slope; however, there are no excavation or embankment bid items. Are the existing foreslopes assumed to be 4:1 or flatter? If not, please clarify how the required 4:1 slope is intended to be constructed and identify the source of any additional material required.
230-P01 FORESLOPE RESHAPING: Except in guardrail embankment areas, till the foreslope
to a minimum 4” depth and a 10’ minimum width. Blade away the tilled material from
the existing slough before completing the full-depth reclamation with cement-treated
base or overlay.
After final surfacing is in place, reshape the foreslope using the tilled material to
provide a smooth transition between the finished shoulder and the existing foreslope.
Remove all rock and chunks of asphalt, sod, or dirt to allow a smooth transition.
Include the cost to strip topsoil into a berm, stabilize and maintain the berm, reshape
the embankment to a 4:1 minimum slope, and replace the topsoil in the price bid for
"Foreslope Reshaping". Seeding and soil stabilization will be measured and paid
separately after topsoil is replaced.
DOT Response
Response Pending.
Submitted: 10/28/2026 9:35:01 AM