Per Plan Note 411-P01, Is it the intent that the excess milled material stockpiled at the NDDOT DL Yard be processed through a separate operation, i.e. crushing, to meet the maximum particle size of 1.5"?
Additional Questions
NDDOT Rugby Yard
Submitted:
4/3/2026 1:44 PM
DOT Response
The intent of the note was for the DOT to receive a usable product free of chunks larger than 1.5". It is up to the contractor to come up with an operation that achieves that specification.
Submitted: 4/3/2026 1:42:56 PM
Answered: 4/6/2026 11:26:04 AM