Bid Opening Date - April 10, 2026 9:30 AM CT

Submitted Questions for Job 24771 - NH-3-002(182)224

In regards to the milling and paving operations of the multi-lanes, would it be acceptable to pave a single lane more than one day's run in advance of the adjacent lane in order to eliminate putting live traffic on the milled surface? This is referencing Std Specs. Sec. 430.04H.1. Par. 7.

DOT Response

We have allowed this in the past but a full plan should be discussed with the District at the prejob. 

Submitted: 4/3/2026 1:47:54 PM

Answered: 4/6/2026 1:26:05 PM

Per Plan Note 411-P01, Is it the intent that the excess milled material stockpiled at the NDDOT DL Yard be processed through a separate operation, i.e. crushing, to meet the maximum particle size of 1.5"?

Additional Questions

NDDOT Rugby Yard

Submitted: 4/3/2026 1:44 PM

DOT Response

The intent of the note was for the DOT to receive a usable product free of chunks larger than 1.5". It is up to the contractor to come up with an operation that achieves that specification. 

Submitted: 4/3/2026 1:42:56 PM

Answered: 4/6/2026 11:26:04 AM