Bid Opening Date - April 10, 2026 9:30 AM CT

Submitted Questions for Job 23929 - NH-RAI-3-281(144)238

The proposal calls for 655 Delineator Drums but layout section 100 sheet 5 says 140 Drums for 2 intersections. Can you work on more than 2 intersections at one time? If not what where do the other Drums go.

DOT Response

Response Pending.

Submitted: 4/6/2026 3:44:22 PM

Answered:

The 6" & 24" Epoxy quantities do not match the Section 110 Sheets.

Answered with Addendum.

Submitted: 4/4/2026 12:17:03 PM

Bid Item #69 Short Term Message-Type R shows 96 SF. Section 100 - 4 Work Zone Traffic Control shows message- arrows that would exceed the bid item amounts. Please clarify the quantities and what arrows are needed. Sheet 100-5 shows Short Term 6" Line-Type R for the crosswalks, there is not a Bid item for this, will it be required.

DOT Response

Response Pending.

Submitted: 4/1/2026 11:13:38 AM

Answered:

Would you be open to expanding the specifications to include RTC equipment as part of the scope?

Answered with Addendum.

Submitted: 3/31/2026 10:31:29 AM

For item 54 (adjust manhole) how many are supposed to have "sanitary sewer" vs "storm sewer" lids? It doesn't look like it's shown on the plans. Note 722-P03 says to provide new castings, so I am assuming you want the R1733 frames with the sanitary or storm lids.

DOT Response

The manhole lids are defined below:

 

 

  • 5 Sanitary Manholes
  • 1 Storm Manhole
  • 2 electrical manholes
  • 3 “Other” manholes (We’re not quite sure what they are the contractor just needs to make sure the surface casting is adjusted to finished grade.

Submitted: 3/30/2026 10:50:19 AM

Answered: 3/31/2026 1:53:54 PM