Section 51, sheet 1. Station 92+02.16. Should the 24" x 24' at this location be 20'? Plan and Profile section 60, sheet 8 shows a 4' elbow and 20' are needed.
What is the correct length required?
DOT Response
Response Pending.
Submitted: 2/10/2026 3:53:45 PM