Bid Opening Date - February 27, 2026 9:30 AM CT

Submitted Questions for Job 24168 - NH-2-013(072)232

Looking at the lighting system, we have some questions about the design and Qty's. - Does each light pole and pedestal get a handhole? We do not understand the bid qty of 42 ea as shown on the plans & details. - The 1'' conduit qty seems extremely high. If we assume it goes from handhole to pole/pedestal, then they would be 30' apart. - Could you show a detail of the locations of handholes to poles/pedestals.

DOT Response

Response Pending.

Submitted: 2/12/2026 3:13:06 PM

Answered:

Bid Item 32 - Reset Sign Support has no plan sheets showing any locations, existing sign type, existing supports or even if they are single or multiple posts. Is there any other information indicating what the signs are and their locations?

DOT Response

See plan Section 90 sheets 7-17 for the sign locations that might be impacted by the ADA ramp concrete work or immediately adjacent to those areas. Complete the work as specified in the spec book in 754.04 F. The signs are single supports consisting of perforated tube supports with stop signs, street name signs, school zone signs or other similar signs.

Submitted: 2/11/2026 9:41:43 AM

Answered: 2/11/2026 11:39:50 AM