Reference the Request for Proposal completion date for contract time. The contract only allows 120 calendar days to complete the work at the Menoken and McKenzie Interchanges which cannot be constructed concurrently so it is 60 calendar days per structure. The work consists of phased construction, removing and replacing the approach slab lip, approach slab and bridge deck overlay. Based on the NDDOT 2024 Specifications a 7 day cure time is required for the approach slab and lip repair pours and a 5 day wet cure of the deck concrete and overlay concrete pours resulting in 24 days of cure time per phase. In addition, the penetrating water repellant treatment cannot be applied until 21 days after the slab is poured. We request the NDDOT re-evaluate and modify the calendar day count to allow a reasonable time frame to complete the phased work based on the project specifications.

DOT Response

This is a working day contract.

Submitted: 12/9/2025 11:18:05 AM

Answered: 12/9/2025 1:09:24 PM

Per Section 10 Sheet 1, will the 14 gallons of prime coat be required prior to paving guardrail embankment?

DOT Response

Prime coat is not required if paved within 24 hours of aggregate being placed. Otherwise, prime coat is required.

Submitted: 12/3/2025 3:29:14 PM

Answered: 12/9/2025 3:21:43 PM

For the Edgedrain Non Permeable Base bid item, what size and type of pipe is required for this? 4" single wall perforated corrugated HDPE or 4" SDR35 perforated PVC?

DOT Response

The pay item "Edgedrain Non Permeable Base" bid item represents the 4" Perforated Corrugated Polyethylene Edgedrain shown on sheet 20-11 and sheet 20-2 with the pay item listed on 90-1.

Under Section "714.03 MATERIALS" of the NDDOT Standard Specifications for Road and Bridge Construction, Sub-Section "D. Edgedrains." refers to materials spec "830.03 A.4 Perforated, Corrugated, P.E. Pipe"

Section 830.03 A.4 reads "4. Corrugated Polyethylene (PE) Pipe. Provide corrugated PE pipe that meets AASHTO M 252.

Submitted: 12/1/2025 1:29:19 PM

Answered: 12/1/2025 4:48:54 PM