1. Does the quantity for Bid Item 010 CONCRETE EROSION CONTROL BLANKET include the quantity of material needed to include 2-block terminations shown in the plans on Section 20 / Sheet 1 and Section 30 / Sheet 1?
2. Is the quantity for Bid Item 010 CONCRETE EROSION CONTROL BLANKET based on neat-line plan view quantities or actual slope lengths?
3. Does the quantity for Bid Item 024 GEOSYNTHETIC MATERIAL TYPE include material necessary for the 2-foot ovelaps between strips and the 2-foot extensions beyond the terminations?
DOT Response
1. No, the 2-block termination is not included in the quantities and is incidental to the installation.
2. The quantities are based on the plan view dimensions of the exposed surface.
3. The quantities are based on the plan view dimensions of the exposed surface.
Submitted: 7/15/2025 12:52:25 PM
Answered: 7/17/2025 8:55:48 AM