CADD Standard Drawings

Drawings Updated and/or Added in the LAST YEAR are Highlighted in Yellow
Click on Headings for Sorting. You can sort by Headings in Ascending and Descending order.
Notice of Disclaimer
12345
Revision DateStandard NoStandard Title
3/15/2013 D020-01 NDDOT Abbreviations
3/15/2013 D020-02 NDDOT Abbreviations
3/15/2013 D020-03 NDDOT Abbreviations
3/15/2013 D020-10 NDDOT Utility Company Abbreviations
4/20/2011 D020-20 Line Styles
4/20/2011 D020-21 Line Styles
4/20/2011 D020-30 Symbols
4/20/2011 D020-31 Symbols
4/20/2011 D020-32 Symbols
5/19/2009 D203-06 Standard 90 Degree Flared Intersection
12/1/2004 D203-07 Recovery Approaches At T-Intersections
12/8/2008 D203-08 Section Line and Private Drive Approaches (Rural)
10/23/2012 D550-02 Longitudinal Joint Details
9/15/2010 D550-03 Transverse Contraction Joint Details
9/15/2010 D550-04 Transverse Expansion Joint Detail
9/15/2010 D550-05 Transverse Construction Joint
9/14/2011 D622-01 Pile Splice Details
12/19/2008 D638-01 Backfill for Structural Plate Pipes - More Than 4 Feet Below the Proposed Base
12/8/2008 D638-02 Backfill for Structural Plate Pipes - 4 Feet or Less Below the Proposed Base
12/1/2004 D638-03 Steel Structural Plate Pipe (Sloped Ends)
12/1/2004 D638-04 Steel Structural Plate Pipe Arches (Sloped Ends)
12/1/2004 D638-05 Steel Structural Plate Pipe (Squared Ends)
12/1/2004 D638-06 Steel Structural Plate Pipe Arches (Square Ends)
12/1/2004 D638-08 Structural Plate Pipe Junior Interchange with Concrete Floor (Strutted)
12/1/2004 D638-09 Concrete Floor for Structural Plate Pipe
12/1/2004 D638-10 Concrete Floor for Structural Plate Pipe Arches
12/1/2004 D638-11 Concrete Floor for Structural Plate Pipe Arches
9/25/2012 D704-01 Attenuation Device
9/25/2012 D704-02 Traffic Control For Coring of Hot Bituminous Pavement
12/1/2004 D704-03 Lane Markers (Spotting Tab, Seal Jobs Only)
9/25/2012 D704-04 Work Zone Business Sign Details
8/22/2012 D704-05 Contractor Sign Detail
12/1/2004 D704-07 Breakaway Systems For Construction Zone Signs - Perforated Tube
6/29/2005 D704-08 Breakaway Systems For Construction Zone Signs
7/11/2005 D704-09 Construction Sign Details
7/11/2005 D704-10 Construction Sign Details
7/11/2005 D704-11 Construction Sign Details
7/11/2005 D704-12 Construction Sign Details
6/14/2005 D704-12A Construction Sign Details
6/29/2005 D704-13 Barricade Details And Channelizing Devices
12/1/2004 D704-14 Construction Sign and Barricade Assembly Details
7/5/2005 D704-15 Construction Sign and Barricade Location Details
6/29/2005 D704-16 Typical Construction Signal Layout
6/29/2005 D704-17 Sign Layout for One Lane Closure Two Lane Roadway
6/29/2005 D704-18 Sign Layout for Interstate System One Lane Closure
2/16/2007 D704-19 Construction Sign and Barricade Location Details
4/5/2006 D704-20 Construction Sign and Barricade Location Details
6/29/2005 D704-21 Construction Sign and Barricade Location Details
6/29/2005 D704-22 Construction Sign and Barricade Location Details
6/29/2005 D704-23 Construction Sign and Barricade Location Details
6/29/2005 D704-24 Construction Sign and Barricade Location Details
6/29/2005 D704-25 Construction Sign and Barricade Location Details
7/5/2005 D704-26 Construction Sign and Barricade Location Details
12/1/2004 D704-27 Traffic Control Plan For Moving Operations On Conventional Highways (Pavement Marking)
12/1/2004 D704-28 Traffic Control For Mobile Operations
6/29/2005 D704-30 Windrow Marking
6/29/2005 D704-31 Construction Sign Layout - Non-Signalized Low Volume One Lane Closure
6/29/2005 D704-32 Sign Layout For One Lane Closure Divided Highway Moving Operation
9/26/2012 D704-34 Sign Layout For One Lane Closure
10/26/2012 D704-34A Traffic Control System Lane Shift Between a Lane Closure and an Opposite Lane Closure
9/7/2012 D704-35 Sign Layout For One Lane Closure - Interstate System
10/26/2012 D704-35A Sign Layout To Move Traffic To Outside Shoulder On Four Lane Divided Highway
6/29/2005 D704-36 Construction Sign and Barricade Location Details
10/26/2012 D704-37 Construction Sign Layout
9/7/2012 D704-38 Traffic Control System - Median Crossover (800 ft Transition) - 55 MPH Speed Limit or Greater
5/31/2012 D704-39 Traffic Control System - Median Crossover (800 ft Transition) - 55 MPH Speed Limit or Greater
11/19/2012 D704-45 Construction Signing Median Crossover
11/19/2012 D704-49 Construction Sign and Barricade Location Details Construction Traffic Median Crossing
11/23/2010 D704-50 Portable Sign Support Assembly
7/20/2012 D704-51 Portable Precast Concrete Median Barrier (Temporary Usage)
9/5/2012 D704-52 Interstate Road Closure Using Ramps Closure for Less than One day and Crossroad is Not Closed
9/5/2012 D704-52A Interstate Road Closure Using Ramps Closure for More than 5 Days and Crossroad is Not Closed
12/21/2005 D704-53 Interstate Road Closure Using Ramps With Crossroad Closure (Closure for More Than 5 Days)
12/21/2005 D704-54 Interstate Road Closure Using Ramps With Crossroad Closure (Closure for More Than 5 Days)
12/1/2004 D704-55 Pavement Marking And Delineation For Interstate And Crossroad Closure
12345

 

*Note: These documents require a PDF reader such as Acrobat Reader. To download a free copy click on the icon below or go to Download Adobe Reader.


Get Adobe Reader Here