Is DISTRACTED DRIVING worth $100?
Learn about the new ND Distracted Driving Law

NDDOT CADD Standard Drawings

Drawings Updated and/or Added in the LAST YEAR are Highlighted in Yellow

Notice of Disclaimer



Click column headings to sort.

Standard NoStandard TitleRevision Date
D101-01 NDDOT Abbreviations7/1/2014
D101-02 NDDOT Abbreviations8/3/2015
D101-03 NDDOT Abbreviations8/3/2015
D101-10 NDDOT Utility Company and Organization Abbreviations7/1/2014
D101-20 Line Styles9/23/2016
D101-21 Line Styles9/23/2016
D101-30 Symbols7/1/2014
D101-31 Symbols7/1/2014
D101-32 Symbols7/1/2014
D203-05 Standard 90 Degree Flared Intersection - (No Center Left Turn Lane on Major Road)3/29/2016
D203-06 Standard 90 Degree Flared Intersections - (Center Left Turn Lane on Major Road)3/29/2016
D203-07 Recovery Approaches at T-Intersections10/4/2013
D203-08 Standard Rural Approaches6/30/2017
D255-01 Bridge Approach Slab Drainage Detail7/27/2015
D255-02 Erosion and Siltation Control - Erosion Control Blanket Installation7/27/2015
D256-01 Erosion and Siltation Controls6/26/2014
D258-01 Standard Slope Protection Under Bridges7/10/2014
D260-01 Erosion and Siltation Controls - Silt Fence6/27/2016
D261-01 Erosion Control - Fiber Roll Placement Details6/26/2014
D550-02 Longitudinal Joint Details3/16/2016
D550-03 Transverse Contraction Joint Details3/16/2016
D550-04 Transverse Expansion Joint Detail6/23/2014
D550-05 Transverse Construction Joint3/16/2016
D622-01 Pile Splice Details9/14/2011
D704-01 Attenuation Device7/18/2014
D704-02 Traffic Control For Coring of Hot Bituminous Pavement9/25/2012
D704-03 Lane Markers (Spotting Tab for Seal Projects Only)10/3/2013
D704-04 Work Zone Business Sign Details7/18/2014
D704-05 Construction Sign Detail7/18/2014
D704-07 Breakaway Systems For Construction Zone Signs - Perforated Tube2/28/2014
D704-08 Breakaway Systems For Construction Zone Signs - U-Channel Post2/28/2014
D704-09 Construction Sign Details - Terminal and Guide Signs8/13/2013
D704-10 Construction Sign Details - Regulatory Signs8/13/2013
D704-11 Construction Sign Details - Warning Signs8/13/2013
D704-12 Shoulder Closure Tapers10/3/2013
D704-13 Barricade and Channelizing Device Details10/3/2013
D704-14 Construction Sign Punching and Mounting Details11/14/2013
D704-15 Road Closure Layouts9/27/2013
D704-16 Lane Closure on a Two Lane Road Using Traffic Control Signals11/20/2015
D704-17 Sign Layout for One Lane Closure Two Lane Roadway9/27/2013
D704-18 Sign Layout for Interstate System One Lane Closure3/15/2016
D704-19 Road Closure and Lane Closure on a Two Way Road Layouts3/13/2014
D704-20 Terminal and Seal Coat Sign Layouts9/27/2013
D704-21 Detour and Roadway Diversion Sign Layouts9/27/2013
D704-22 Construction Truck and Temporary Detour Layouts9/27/2013
D704-23 Short Term Urban Detour and Lane Closure on a Divided Highway Layouts9/27/2013
D704-24 Shoulder Closures and Bridge Painting Layouts9/27/2013
D704-25 Lane Closures on Urban Streets Layouts9/27/2013
D704-26 Miscellaneous Sign Layouts9/27/2013
D704-27 Traffic Control Plan For Moving Operations6/18/2014
D704-30 Windrow Marking6/24/2014
D704-31 Construction Sign Layout - Non-Signalized Low Volume One Lane Closure9/27/2013
D704-32 Sign Layout For One Lane Closure Divided Highway Moving Operation6/24/2014
D704-34 Sign Layout For One Lane Closure3/15/2016
D704-34A Traffic Control System Lane Shift Between a Lane Closure and an Opposite Lane Closure10/26/2012
D704-35 Sign Layout For One Lane Closure - Interstate System3/15/2016
D704-35A Sign Layout To Move Traffic To Outside Shoulder On Four Lane Divided Highway10/26/2012
D704-37 Maintaining Traffic Through Area Already Full Depth Reclaimed9/17/2015
D704-38 Traffic Control System - Median Crossover (800 Ft Transition) - 55 MPH Speed Limit or Greater11/14/2016
D704-39 Traffic Control System - Median Crossover (800 Ft Transition) - 55 MPH Speed Limit or Greater11/14/2016
D704-45 Construction Signing Median Crossover6/19/2014
D704-49 Construction Sign and Barricade Location Details - Construction Traffic Median Crossing6/24/2014
D704-50 Portable Sign Support Assembly11/23/2010
D704-51 Portable Precast Concrete Median Barrier (Temporary Usage)7/20/2012
D704-52 Interstate Road Closure Using Ramps - Closure For Less Than One Day - and Crossroad is not Closed3/15/2016
D704-52A Interstate Road Closure Using Ramps - Closure for More Than Five Days - and Crossroad is not Closed3/15/2016
D704-53 Interstate Road Closure - Using Ramps With Crossroad Closure - Closure for More Than Five Days3/15/2016
D704-54 Interstate Road Closure - Using Ramps With Crossroad Closure - Closure for More Than Five Days3/15/2016
D704-55 Pavement Marking And Delineation for Interstate and Crossroad Closure9/27/2013
D704-56 Mobile Operation - Grinding Shoulder Rumble Strips11/15/2012
D704-57 Two-way, Two-lane Operation on Divided Highway With Excavation in the Median9/18/2015
D704-58 Divided Highway Operation for Overhead Structure, Pier, and Footing Replacement9/18/2015
D704-59 Two-way, Two-lane Operation on Divided Highway for Overhead Structure, Pier, and Footing Replacement9/18/2015
D704-60 Interior Lane Closure On 6 Lane Interstate11/15/2012
D704-61 Left Lane Closure On 6 Lane Interstate11/19/2012
D704-62 Right Lane Closure On 6 Lane Interstate11/15/2012
D704-63 One Road Closure Four-Lane Divided Highway - For Access To Two-Way Two-Lane Roadway11/15/2012
D706-01 Bituminous Laboratory1/11/2016
D708-06 Erosion and Siltation Controls - Median or Ditch Inlet Protection10/1/2014
D714-01 Reinforced Concrete Pipe Culverts and End Sections (Round Pipe)11/21/2016
D714-02 Reinforced Concrete Pipe Arch Culverts and End Sections5/12/2014
D714-04 Round Corrugated Steel Pipe Culverts and End Sections2/27/2014
D714-05 Corrugated Steel Pipe Arch Culverts and End Sections2/27/2014
D714-08 4' x 6' Precast Concrete Cattle Pass7/7/2014
D714-10 5' x 7' Precast Concrete Stock Pass1/31/2017
D714-11 Traversable End Sections For Corrugated Steel Pipe Culverts7/23/2009
D714-13 Reinforced Concrete Pipe Baffle Rings3/6/2014
D714-16 Jacked and Bored Pipe7/7/2014
D714-18 Edgedrain Details10/27/2010
D714-22 Concrete Pipe, Cattle Pass, or Precast Concrete Box Culvert Ties6/6/2017
D714-25 Transverse Mainline Pipe Installation Detail - Pipes More Than 4 Feet Below Top of Subgrade12/10/2015
D714-25M Transverse Mainline Pipe Installation Detail - Multiple Pipes More Than 4 Feet Below Top of Subgrade12/10/2015
D714-26 Transverse Mainline Pipe Installation Detail - Pipes 4 Feet or Less Below Top of Subgrade9/18/2015
D714-26M Transverse Mainline Pipe Installation Detail - Multiple Pipes 4 Feet or Less Below Top of Subgrade9/18/2015
D714-27 Pipe Installation Detail for Longitudinal Mainline Pipe or Pipe Not Under the Roadway12/10/2015
D714-27M Pipe Installation Detail for Multiple Longitudinal Mainline Pipe or Pipe Not Under the Roadway12/10/2015
D714-28 Transverse Mainline Pipe Installation Detail for Pipes Installed in New Embankment Areas12/10/2015
D714-28M Transverse Mainline Pipe Installation Detail for Multiple Pipes Installed in New Embankment Areas12/10/2015
D720-01 Standard Monuments and Right of Way Markers11/12/2013
D722-01 Inlet - Type 16/24/2014
D722-01A Inlet - Catch Basin6/24/2014
D722-01B Inlet - Special3/18/2014
D722-02 Inlet - Type 27/7/2014
D722-03 Inlet - Mountable Curb7/7/2014
D722-03A Inlet - Slotted Drain3/17/2014
D722-05 Manhole Details6/24/2014
D722-06 Median Drain and Riser Details for Corrugated Steel Pipe Culverts7/22/2010
D722-07 Precast Concrete Median Drain6/30/2014
D724-01 Waterworks9/22/2010
D748-01 Curb & Gutter and Valley Gutter8/7/2013
D748-03 Precast Concrete Wheel Stop7/20/2010
D750-01 Concrete Driveway - Urban2/13/2014
D750-02 Sidewalk11/26/2013
D750-03 Curb Ramp Details11/26/2013
D752-01 Standard Barbed Wire Fence11/25/2013
D752-02 Chain Link Fence9/28/2010
D752-03 Standard Woven Wire Fence10/2/2012
D752-04 Concrete Cattle & Stockpass Fencing Standard10/4/2013
D752-05 Two Strand Cable Fence10/2/2012
D754-01 Pipe or W-Shape Assembly Details7/18/2014
D754-02 Breakaway Coupler System for Standard Pipe - Stub Post10/3/2013
D754-03 Breakaway System for Standard Pipe - Stub Post2/28/2014
D754-04 Multi-Directional Breakaway System for Standard Pipe - Stub Post2/28/2014
D754-05 Foundation Data For Steel Supports10/3/2013
D754-06 Hinge Plate, Fuse Plate, and Foundation Details for Standard Pipe2/28/2014
D754-07 Pipe Support and Sign Mounting Details2/21/2014
D754-09 Letter and Arrow Details For Variable Length Signs5/4/2016
D754-12 Breakaway Coupler System - Structural Details for W-Shape Supports7/8/2014
D754-13 Breakaway System Structural Details for W-Shape Supports7/18/2014
D754-14 Wind Beams and Anchor Plates for W-Shape Supports7/8/2014
D754-18 Barricade and Advance Signs for Forward Roadway Termination7/8/2014
D754-19 (Conventional Use) Reference Markers7/8/2014
D754-20 (Expressway-Freeway Use) Mile Posts7/8/2014
D754-21 Reflectorized Delineators7/18/2014
D754-22A Typical Interchange Delineation9/25/2012
D754-22B Typical Rest Area Delineation9/25/2012
D754-22C Approach Delineation8/22/2012
D754-23 Perforated Tube Assembly Details7/8/2014
D754-24 Mounting Details Perforated Tube8/6/2009
D754-24A Breakaway Coupler System for Perforated Tubes10/3/2013
D754-25 Mounting Details Perforated Tube7/8/2014
D754-26 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-27 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-28 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-29 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-30 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-31 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-32 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-33 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-34 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs12/1/2010
D754-35 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-36 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-37 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs9/25/2012
D754-38 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-39 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-40 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-41 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-42 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-43 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-44 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-45 Sign Punching, Stringer, and Support Location Details Regulatory, Warning and Guide Signs8/22/2012
D754-46 Punching, Stringer, and Support Location Details for Regulatory, Warning and Guide Bike Route Signs9/18/2015
D754-47 Sign Punching, Stringer and Support Location Details for Variable Length Signs9/25/2012
D754-48 Sign Punching, Stringer and Support Location Details for Variable Length Signs9/25/2012
D754-49 Sign Punching, Stringer and Support Location Details for Variable Length Signs9/25/2012
D754-50 Sign Punching, Stringer and Support Location Details for Variable Length Signs9/25/2012
D754-51 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-52 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-53 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-54 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-55 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-56 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-57 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-58 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-59 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-60 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-61 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-62 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-63 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-64 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-65 Sign Punching, Stringer and Support Location Details - Route Marker Signs9/25/2012
D754-66 Sign Punching, Stringer and Support Location Details - Route Marker Signs9/25/2012
D754-67 Sign Punching, Stringer and Support Location Details - Route Marker Signs9/25/2012
D754-69 Sign Punching, Stringer and Support Location Details - Route Marker Signs9/25/2012
D754-70 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-72 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-73 Sign Punching, Stringer and Support Location Details - Route Marker Signs8/22/2012
D754-74 Sign Punching, Stringer and Support Location Details - Route Marker Signs9/25/2012
D754-77 Sign Punching, Stringer and Support Location Details - Divided Highway Control Signs8/22/2012
D754-78 Sign Punching, Stringer and Support Location Details - Divided Highway Control Signs8/22/2012
D754-79 Chevron Installation Details10/10/2013
D754-80 Light Standard, Signal Standard, and Span Wire Mounted Sign Assembly Detail10/3/2013
D754-81 Railroad Crossing Signs for Passive Grade Crossings11/4/2013
D754-82 Object Markers7/18/2014
D754-83 Object Markers - Culverts7/7/2014
D754-84 Narrow Bridge Guide2/21/2014
D754-85 Truck Inspection Roadside Site - Sign Details for Conventional Roadways6/27/2014
D754-85A Truck Inspection Roadside Site - Pulley Winch for 6' x 3.5' Sign9/27/2013
D754-85F Truck Inspection Roadside Site Pulley Winch Sign Cover for Warning Signs11/12/2013
D754-85G Pulley Winch Sign Cover for Warning Signs2/26/2014
D754-86 911 Sign Support Information and Sign Details7/18/2014
D754-87 Sign Punching, Stringer and Support Location Details for Street Name Signs and 911 Signs10/3/2013
D760-01 Rumble Strips Interstate Highways9/8/2011
D760-02 Rumble Strips Divided Highways (Non-Interstate)9/8/2011
D760-03 Rumble Strips Undivided Highways (Shoulders 4' or Greater)9/8/2011
D760-04 Rumble Strips Undivided Highways (Shoulders Less Than 4')1/26/2012
D760-05 Saw Slotted Rumble Strips at Intersections7/7/2014
D762-01 Pavement Marking Message Details12/6/2011
D762-02 Interstate Pavement Marking 4 Lane Divided Highway8/3/2011
D762-04 Pavement Marking12/1/2010
D762-05 Pavement Marking for Standard 90 Degree Flared Intersection-(No Center Left Turn Lane on Major Road)3/29/2016
D762-06 Pavement Marking for Standard 90 Degree Flared Intersection - (Center Left Turn Lane on Major Road)3/29/2016
D762-11 Short-Term Pavement Marking3/29/2016
D764-01 W-Beam Guardrail General Details10/11/2013
D764-05 Sequential Kinking Terminal10/11/2013
D764-06 Flared Energy Absorbing Terminal10/11/2013
D764-07 Slotted Rail Terminal10/11/2013
D764-09 W-Beam Transition to Concrete Jersey Barrier With Approach Curb10/11/2013
D764-10 Thrie Beam Transition to Double Box Beam Retrofit10/11/2013
D764-11 W-Beam Transition to In Place Concrete Safety Shape Transition10/11/2013
D764-13 W-Beam Guardrail With Approaches Near Bridge For Low Volume Low Speed Roadways10/11/2013
D764-14 Special W-Beam Guardrail Anchor10/11/2013
D764-20 Short Term End Treatment For Bridges (Attenuation Device Method)9/27/2013
D764-21 Short Term End Treatment For Bridges (Guardrail Method)9/27/2013
D764-22 Typical Grading at Bridge Ends with W-Beam Guardrail10/3/2013
D764-23 Typical Grading at Obstructions with W-Beam Guardrail10/3/2013
D764-32 Three Cable Guardrail2/2/2014
D764-38 MGS Flared Energy Absorbing Terminal - Wood Post7/14/2017
D764-39 MGS Slotted Rail Terminal - Steel Post7/14/2017
D764-40 MGS W-Beam Guardrail General Details7/14/2017
D764-41 MGS Trailing End Anchor7/14/2017
D764-48 Typical Grading at Bridge Ends with MGS W-Beam Guardrail7/14/2017
D764-49 Typical Grading at Obstructions with MGS W-Beam Guardrail7/14/2017
D764-50 MASH SoftStop End Terminal - Steel Post7/14/2017
D764-51 MASH Sequential Kinking Terminal - Wood Post7/14/2017
D764-60 MGS W-Beam Transition with Approach Curb to Concrete Single Slope or Jersey Barrier7/14/2017
D764-61 Single Slope to Thrie Beam Connector Plate Details7/14/2017
D764-62 Jersey Barrier to Thrie Beam Connector Plate Details7/14/2017
D764-63 MGS W-Beam Transition to Concrete Safety Shape Transition7/14/2017
D764-64 MGS W-Beam Transition with Approach Curb to In Place Concrete Jersey Barrier7/14/2017
D766-01 Mailbox Location Details9/15/2010
D770-01 Concrete Foundations (Traffic Signals & Highway Lighting)6/15/2010
D770-02 Feed Points (Roadway Lighting)7/8/2014
D770-02A Combination Feed Point Details10/8/2013
D770-03 Pull Box Details7/8/2014
D770-04 Lighting and Signal Details10/8/2013
D770-05 Light Standard Details10/8/2013
D770-06 Overhead Sign Lighting Details (LED -- Sign Structure Mounted)5/29/2014
D770-06A Overhead Sign Lighting Details (LED -- Bridge Mounted)5/29/2014
D770-07 Overhead Sign Lighting Details (Metal Halide -- Sign Structure Mounted)10/15/2013
D770-07A Overhead Sign Lighting Details (Metal Halide -- Bridge Mounted)10/15/2013
D770-08 High Mast Lighting10/8/2013
D770-09 High Mast Lighting10/8/2013
D772-01 Feed Point - Traffic Signals11/14/2013
D772-02 Traffic Signal Standards11/14/2013
D772-03 Traffic Signal Standards (Mast Arm Type)11/14/2013
D772-04 Traffic Signal Head Mounting7/8/2014
D772-05 Loop Detector Details (Saw Slot)11/14/2013
D772-05A Loop Details11/14/2013
D772-06 Span Wire Mounted Traffic Signals7/8/2014
D772-07 Flashing Beacon7/8/2014
D900-01 Bridge Bench Marks9/14/2011
D900-02 Pavement Details at Railroad Crossing10/1/2013
D900-03 Road Closure Gate Detail9/20/2011

*Note: These documents require a PDF reader such as Acrobat Reader.

Download Adobe Reader