Fargo District Construction Projects

Fargo District Construction Projects

The District office is located in Fargo with section shops located throughout the district. The Fargo District maintains state highways in Traill, Cass, Richland, Sargent, Ransom, Steele, Grand Forks, Lamoure and Dickey counties.

Current and Future Projects

  • Structure repair project on I-29 southbound bridge at the Wild Rice River
  • Mill and overlay on Hwy 10 Junction 18 Casselton E. to Mapleton
  • Spall repair, joint repair, CPR and deck repair on I-94, 9th St, 45th St and I-29 interchange
  • Grading, PCC, bridge, and bike path work on 64th Ave S and 38th St S to 33rd St S in Fargo
  • PCC reconstruction on I-29, Northbound, 3.8 Miles S of Grandin to 1.2 Miles N of ND 200
  • Chip seal on Hwy 11 N junction 1 to Forman
  • Chip seal on ND 18 and 200, Portland to 200A
  • Chip seal on Hwy 13, S junction 1 to W junction 32
  • Sidewalk, driveway, and curb construction Lidgerwood 2nd St to 5th St
  • Reconstruction Hankinson ND 11, 4th Ave SW to 3rd Ave
  • Mill and overlay on Hwy 18 from Cass Co line to Blanchard
  • Mill and overlay on Hwy 38 from JCT I-94 North to Page
  • Intersection turn lane improvements on I-29 /38th St. Intersection
  • Concrete Pavement Repair (CPR), on I-29 from Main Ave to Co 20 north and southbound lanes
  • Chip seal on I-29 near SD border (SD line to RP 11, 11.3 Miles)
  • Chip seal on Hwy 18 from Blanchard to Mayville
  • Deck Overlay on the Wild Rice River structure at RP 14.58 North Bound Roadway, Deck Replacement Exit 15 (Great Bend Interchange), and Deck Overlay on the BNSF Separation (RP 33.013) South Bound Roadway
  • Structure repair on I-94 Raymond Interchange
  • 2021 Statewide Construction Map
    • 2021 Construction Projects with 2020 carryover.

Contact Information