North Dakota Width/Height Restrictions Last Updated at: 5/19/2013 8:00:55 AM I 29 N (MP: 147.226 to 152.337) N OF N GF INTER TO MANVEL - NB Restrictions associated with work zone: Width - 12.0 ft. Comments: One lane closure. Speeds reduced to 40 mph where workers are present. Width restriction of 12'. Flaggers may be present. Key: CN-18691 I 29 S (MP: 118.012 to 129.539) BUXTON TO S OF ND 15-SB Restrictions associated with work zone: Width - 22.0 ft. Height - 16.0 ft. Comments: SB roadway CLOSED. Traffic diverted to head-to-head in NB roadway from MP 118 to MP 129. Speed Limit 65 mph, 40 mph at times. Buxton Interchange (Exit 118) bridge is CLOSED. Please follow detour signs. Key: CN-18340 I 29 S (MP: 144.700 to 145.500) North Grand Forks Interchange Restrictions associated with work zone: Width - 12.0 ft. Comments: Southbound driving lane closed due to bridge maintenance. Traffic speeds reduced within lane closure to 45 mph. Key: MA-100050 I 29 S (MP: 147.226 to 161.700) N OF N GF INTR - WALSH CO LINE - SB Restrictions associated with work zone: Width - 12.0 ft. Comments: One lane closure. Speeds reduced to 40 mph where workers are present. Width restriction of 12'. Flaggers may be present. Key: CN-17763 I 29 S (MP: 200.000 to 203.500) Joliette Interchange south approx 3 Miles. Restrictions associated with work zone: Width - 14.0 ft. Comments: One lane closure for maintenance concrete pavement repair on driving lane which will begin on May 13. The work is expected to last approx 2 weeks. Traffic can expect reduced speeds through the work zone. Key: MA-100049 I 94 E (MP: 23.001 to 23.001) West River road bridges on I-94 east and westbound roadway at RP 23 Restrictions associated with work zone: Width - 14.0 ft. Comments: Watch for construction vehicles exiting roadway Key: CN-18270 I 94 W (MP: 23.001 to 23.001) West River road bridges on I-94 east and westbound roadway at RP 23 Restrictions associated with work zone: Width - 14.0 ft. Comments: Watch for construction vehicles exiting roadway Key: CN-18270 US 2 E (MP: 53.000 to 54.000) Through City of Ray Restrictions associated with work zone: Width - 10.0 ft. Comments: Traffic is reduced to 2 lanes head to head. 10 ft width restriction both directions. For loads exceeding 10 feet in width please contact the Contractor Lakeshore Contracting - Dan Rodgers 701-339-8535. Key: MA-100048 US 2 E (MP: 150.841 to 171.742) 55TH ST E TO 1.7 MI E GRANVILLE-EB Restrictions associated with work zone: Width - 11.0 ft. Comments: Guardrail work will began at Surrey on May 17, 2013. Reduced speed limit through work area. Key: CN-18594 US 2 W (MP: 20.383 to 31.954) Williams County Rd 7b to Williams County Rd 8 Restrictions associated with work zone: Width - 11.0 ft. Comments: Intermittent work including roadway surface grinding, lane striping, and asphalt paving will be taking place and may require localized single lane closures at times. Key: CN-18611 US 83 N (MP: 0.000 to 15.300) STATE LINE N TO STRASBURG Restrictions associated with work zone: Width - 16.0 ft. Comments: Widening on both sides of the road. Beginning on south end of the project. As the work progresses, multiple gravel surface areas will appear. Use caution when approaching areas indicating pavement breaks. Key: CN-17708 US 85 (MP: 63.011 to 63.011) Bridge on US 85 south of Belfield at RP 63 Restrictions associated with work zone: Width - 13.5 ft. Comments: Watch for construction vehicles exiting roadway. Key: CN-19725 US 85 (MP: 72.196 to 74.540) Bridge on US 85 south of Belfield at RP 72 Restrictions associated with work zone: Width - 13.5 ft. Comments: Watch for construction vehicles exiting roadway Key: CN-18263 US 281 N (MP: 178.849 to 189.738) 3 MI N CHURCHS FERRY TO CANDO Restrictions associated with work zone: Width - 11.0 ft. Comments: Hot Bituminous Paving to Began May 13, 2013. Pilot Car and Flaggers will direct traffic thru the work area Key: CN-18106 ND 8 (MP: 174.140 to 197.124) HWY 8, ND 50 TO US 52 Restrictions associated with work zone: Width - 12.0 ft. Comments: Construction Work occurring within the City of Bowbells. Expect delays in City. Ditch work occurring north of ND 50 outside of roadway. Contact # for Project Superintendent Jason (701) 866-0403. Key: CN-19207 ND 22 N (MP: 88.000 to 91.000) NEAR STARK CO LINE TO NEAR RP 91 Restrictions associated with work zone: Width - 12.0 ft. Comments: Work taking place on shoulders, please reduce speed. Speed limits will be reduced to 25mph for bridge reconstruction from RP 90.7 to 90.9. Traffic may be reduced to one lane in this area with flaggers or pilot car present between 7:00PM to 5:00AM. Key: CN-19836 ND 23 (MP: 56.405 to 66.370) ND 8 TO ND 37 Restrictions associated with work zone: Width - 15.0 ft. Comments: Reduced speeds when signs posted along route. Flaggers may be present. Key: CN-19205 ND 23 (MP: 66.370 to 78.359) ND 37 TO CO LINE Restrictions associated with work zone: Width - 12.0 ft. Comments: Shoulder work including top soil removal will begin at the Mountrail/Ward County Line on May 20,2013. Reduced speed limit through the work area. Key: CN-19375 ND 26 (MP: 12.634 to 12.734) 9 WEST OF ND 32 at Sibley. Restrictions associated with work zone: Width - 12.0 ft. Comments: The project will be constructed under traffic. Traffic flow will be reduced to one lane traffic. Traffic control including advanced warning, stop bars, and stop lights will be used. Key: CN-17734