nd.gov - The Official Portal for North Dakota State Government
North Dakota: Legendary. Follow the trail of legends
Department of Transportation
North Dakota
 

 



North Dakota Road Construction

 

ColorBlack & WhiteBismarckMinotFargoTextInteractive Map

Last updated at 7/25/2008 8:15:47 AM

Highway Construction Areas
7/25/2008


5.   I 94   W FGO 9TH ST/I-94 SEPAR (SURCHARGE) - STRUCTURAL FILLS
Barriers and attuneation devices are present. Speed limits normal.
PCN - 16296

6.   I 94   SE CASS DIKE INSTALLATION - STRUCTURAL FILLS
No lane closures set up and speed limits are normal. Work done being
done behind the barriers
PCN - 17035

7.   I 94B  MANDAN-MAIN ST HEART RIVER BRIDGE - STRUCTURAL AND INCIDENTALS
There is two lane traffic across the new Heart River Bridge on business
loop I-94 at mile point 915.01.  A 12' width restriction
is still in effect. Overload permits will not be issued to cross
this bridge.
Width Restriction - 12
PCN - 16593

8.   I 94B  BISMARCK-MANDAN MEMORIAL BRIDGE - STRUCTURAL AND INCIDENTALS
The SE Loop on the west Memorial Bridge Interchange to travel north
to I-94 is now OPEN. The SE Ramp remains closed. A detour for
the SE Ramp is in place using the McKenzie Drive Interchange and
46th Street in Mandan to get onto Memorial Highway.
PCN - 13994

9.   ND 294  FGO-12TH AVE N BNSF RAILROAD BRIDGE - STRUCTURAL WIDENINGS
Speed limit on structure 25 MPH. Two way traffic on structure. One
lane each direction.
Width Restriction - 11
PCN - 14236

10.  I 29   I-29 AT 52ND AVE S.-RAMP & STRUCTURE - RAMP REVISIONS
I29 & 52 A Interchg;  I29  SB single lane closure, 12' width, 3'shldr
lt, 2' shldr rt, 16.2' height restr., exit traffic  SB at 52
A  use temp. loop RP 60.359.  NB I29 single lane closure with
14' width plus 4' shldr rt, 16' height.  NB I29 wide loads use ramp
detour (overhd. 52 A.)  RP 60.441
Width Restriction - 12
Height Restriction - 16
PCN - 12769

11.  I 29   I-29 & 52ND AVE S NW & NE FRONT ROAD - AGGREGATE BASE
31st str. S.& 38th str. S. have been closed for reconstruction, north
& south bound traffic will have to seek alternate routes.
PCN - 17172

12.  ND 23   WATFORD CITY SECTION - MILLING
4th Ave NE & Main Street thru Watford City are under construction.
Eastbound traffic off Hwy 85 should take the Hwy 23 truck route.
Westbound traffic off Hwy 23 should take the Hwy 23 truck route.
Expect truck traffic, construction equipment and detours.
PCN - 15926

13.  I 94   BUFFALO TO WHEATLAND-EB - PCC PAVEMENT
I94 EB from RP 315 (Buffalo Int.) to RP 323 closed - traffic head
to head on WB roadway.   At Absaraka - Exit 322  the bridge & all
ramps are closed.  At  Ayr Exit 317 -  the S ramps are closed
to the public & the crossroad has single lane traffic over the
bridge.
Width Restriction - 14
Height Restriction - 15.5
PCN - 13476

15.  US 81B  FARGO-52ND AVE S (I-29 TO UNIV DR) - GRADE
Jersey Barriers have been installed on both shoulders thru a 300
ft construction zone on 52nd Ave S, from 31st St to 25th St. The
maximum lane width is 11ft. 52nd Ave is closed from 25th Street
to University Dr. The traffic on 52nd Ave is detoured around on
25th St to 58th Ave to University Dr.
Width Restriction - 11
Height Restriction - 11
PCN - 15186

16.  US 83   MINOT-BROADWAY(4TH AVE - UNIVERSITY) - AGGREGATE BASE
Head To Head Traffic On Broadway From Central Ave. To University
Ave.   Head To Head Traffic On 4th Ave From Broadway To 4th St.
Width Restriction - 11
Height Restriction - 17
PCN - 15182

17.  I 94   NEAR SOUTH HEART TO W.DICK INTCHG-EB - PCC PAVEMENT
WESTBOUND:  Two-way traffic on this roadway. Speed limit is 40 mph
on entering and exiting two-way traffic set up, otherwise 65 mph.
Width restrictions of 18 ft for westbound traffic and 14 ft
for eastbound traffic are in place.   EASTBOUND: Traffic is head-to-head
on the westbound roadway.
PCN - 14701

18.  I 29   BNSF RR SEP & WILD RICE RIV-NB - BRIDGE DECK OVERLAY
NORTHBOUND I-29 will be reduced to a single lane at RP 33 (Bridge
over BNSF Tracks) and 42 (Bridge over Wild Rice River).  Speed
will be reduced to 40 mph during working hours.  Width restriction
of 17'.  If flagger is present speeds will be reduced to 25MPH.
Width Restriction - 17
PCN - 16758

19.  US 2    BERWICK TO 1 MI W RUGBY-WB - WIDENING
Westbound Lane closed from MP 201.42 to 209.66.  Two Lane Traffic,
speeds reduced 60 MPH.
Width Restriction - 12
PCN - 15903

20.  US 81   NORTH JCT 66 N TO JCT 5 AT HAMILTON - GRADE
Road work on US 81 from the intersection on ND 66 near St. Thomas
to the intersection of ND 5 at Hamilton. Speeds will be reduced
to 55 MPH during work activity.
PCN - 13132

22.  I 94   GRANT MARSH BRIDGE - PREVENTIVE MAINTENANCE
This project has no effect on traffic.
PCN - 16863

24.  ND 41   RR UNDERPASS RP 73.417 TO 73.498 - DRAINAGE IMPROVEMENTS
Hwy 41 is reduced to one lane traffic through the underpass in the
city of Velva. Traffic being controlled with a temporary traffic
signal system.
Width Restriction - 12
Height Restriction - 14.58
PCN - 15936

25.  I 94   YOUNGMANS BUTTE-2 MI W EAGLES NEST-W - HOT BITUMINOUS SURFACING
Expect short areas of reduced speed and shoulder closures on the
Eastbound and Westbound roadways.  Construction equipment will be
working in the north ditch.
PCN - 16270

26.  ND 200  JCT 49 E TO W END OF HAZEN - GRADE
Expect 10 -15 minute delays.  Flaggers and pilot cars will control
traffic during working hours. The speed limit is 25 MPH thru the
construction area and traffic will be on a gravel surface for
the remainder of the summer.  No overweight vehicles allowed due
to the soft subgrade.
PCN - 15919

27.  I 29   4 SITES 0N I-29 IN GF DISTRICT - APPROACH SLAB REPAIR
Lane closure in NB roadway from south of Demers Ave. to north of
Gateway Drive.  Lane closure in SB roadway at Demers Ave. Interchange
(Exit 140) at Grand Forks.  Speed reduced.  Flaggers may be
present during working hours.
Width Restriction - 15
PCN - 16375

28.  ND 32   US 2 NORTH TO CO LN - HOT BITUMINOUS SURFACING
Contractor is paving mainline. Traffic is being directed by flaggers
and pilot car, expect 10 minute delays.
PCN - 12519

29.  ND 32   CO LN N TO JCT 17 - HOT BITUMINOUS SURFACING
Contractor is paving mainline. Traffic is being directed by flaggers
and pilot car, expect 10 minute delays.
PCN - 17096

30.  ND 200  HILLSBORO - CURB & GUTTER
ND 200 is closed through Hillsboro.  Traffic is being detoured onto
 Interstate 29 from exit 100 to exit 111.
PCN - 16592

31.  ND 200  CITY OF HILLSBORO (SANITARY SEWER) - STORM SEWER
Highway 200 closed from Caledonia to North edge of Hillsboro
PCN - 17214

32.  ND 1806 MANDAN-MANDAN AVE NE (MAIN TO I-94) - AGGREGATE BASE
Mandan Ave reduce to one lane one way road.  Traffic is only allowed
south bound.  North bound traffic not allowed.  North bound
detour signs in place.  Access to business from 13th ave.  Main
Street is reduced to one lane traffic in each direction between
Twin City Drive and Mandan Ave
Width Restriction - 12
PCN - 15887

33.  ND 25   CENTER - HOT BITUMINOUS SURFACING
All work at this time will be off road.  Equipment will be working
on the shoulder of the roadway.  Construction signing and flaggers
will be used as needed.  The posted speed limit is 25 MPH.
PCN - 16595

34.  ND 25   CENTER W TO JCT 31-HANNOVER - FULL DEPTH RECLAMATION
Initially all work will be off road but equipment and vehicles may
be near or crossing the roadway.  Shoulder work signs will be
in place.  Caution is advised in areas where work is in progress.
 Flaggers will be present as needed.
PCN - 16342

36.  US 2    US 2 AND GF CO RD 4A-WB - GRADE
Traffic is running head-to-head on the eastbound roadway from RP
331.24 to 333.23.  Speeds reduced to 60 MPH on the eastbound roadway,
and 40 MPH on the median crossover transitions.  Flaggers
may be present at times to further reduce speed where workers are
present.
Width Restriction - 12
PCN - 17003

37.  US 2    1.4 MI W JCT 18 E TO 1 MI W GF AFB-E - THIN LIFT OVERLAY
Traffic is running head-to-head on the eastbound roadway from RP
331.24 to 333.23 (For WB project).  Speeds reduced to 60 MPH on
the eastbound roadway, and 40 MPH on the median crossover transitions.
 Flaggers may be present at times to further reduce speed
where workers are present.
Width Restriction - 12
PCN - 16798

39.  I 94   CRYSTAL SPRINGS TO STREETER-WB - CPR
W Bound I-94 driving lane closed from RP 219 to 229. Speeds reduced
when workers present.
Width Restriction - 14
PCN - 13470

40.  ND 1    NEKOMA SPUR N TO JCT 5-LANGDON - GRADE
Work continues on both shoulders and in the east ditch along the
urban portion of the construction zone.
PCN - 16407

41.  ND 5    JCT 1-LANGDON-E TO END PCC - CRACK AND SEAT
Watch for people unloading concrete pipe along the shoulder of the road.
PCN - 16345

44.  I 29   BOWESMONT TO CANADIAN LINE - SELECTIVE GRADING
NB traffic reduced to 55mph on I-29 from N. Bowes. Sep. RP 197, to
Joliette Int. RP 206.  NB traffic at the Joliette Int., Bathgate
Int., & Neche Int. will be detoured to the interchange ramps
going N.  The Joliette Int. bridge is closed, E & W traffic is detoured
to the next N or S interchange.
Width Restriction - 20
PCN - 15924

45.  I 29   BOWESMONT INTR TO BATHGATE SEP-NB - MILLING
NB traffic reduced to 55mph on I-29 from N. Bowes. Sep. RP 197, to
Joliette Int. RP 206.  NB traffic at the Joliette Int., Bathgate
Int., & Neche Int. will be detoured to the interchange ramps
going N.  The Joliette Int. bridge is closed, E & W traffic is detoured
to the next N or S interchange.
Width Restriction - 20
PCN - 16850

46.  I 29   NORTH BOWESMONT SEP & JOLIETTE - STRUCTURAL AND INCIDENTALS
NB traffic reduced to 55mph on I-29 from N. Bowes. Sep. RP 197, to
Joliette Int. RP 206.  NB traffic at the Joliette Int., Bathgate
Int., & Neche Int. will be detoured to the interchange ramps
going N.  The Joliette Int. bridge is closed, E & W traffic is detoured
to the next N or S interchange.
Width Restriction - 20
PCN - 15319

48.  US 281  JCT 200-CARRINGTON-TO S JCT 15 - BLENDED BITUMINOUS BASE
US 281 from Carrington north 13 miles to jct of 1 ND15.Shoulder and
inslope reconstruction,speed reduced to 45 in work area which
is two to three miles long.Traffic controlled by pilot car & flaggers.
speed 55 in other areas. Can expext 15 minn delay.
PCN - 16385

53.  ND 11   HANKINSON E TO I-29 - WIDENING
40 mph speed limit.  Flaggers control traffic to one lane.  Shoulders
drop-off on both sides of road.
PCN - 16803

54.  ND 8    JCT 23-E NEW TOWN-N TO STANLEY - CHIP SEAL COAT
Seal coat application in Miles 132 to 156 has been completed. Speed
limit 65 MPH.
PCN - 17254

55.  ND 8    NORTHEAST OF NEW TOWN - STRUCTURAL AND INCIDENTALS
Working in ditches along both sides of roadway in Miles 137 to 139.
Temporary bypass open in Mile 138; speed limit 25 MPH in this
area.
Width Restriction - 30
PCN - 14757

56.  I 94B  MANDAN-MAIN ST(HEART RIVER TO ND 6) - GRADE
There is two lane traffic across the new Heart River Bridge on business
loop I-94 from the intersection of Highway 6 to the west
side of the heart river bridge.  A 12' width restriction is still
in effect. Overload permits will not be issued to cross this bridge.
Width Restriction - 12
PCN - 16594

63.  ND 18   ND18 - BLANCHARD TO MAYVILLE - THIN LIFT OVERLAY
Speeds are normal no delays present work is completed.
PCN - 16844

67.  US 281  S JCT ND 15 TO N JCT ND 15 - THIN LIFT OVERLAY
US 281 from S Jct of ND 15 to N Jct. ND 15. Through New Rockford
has bridge that is closed for replacement. Traffic will use a oiled
bypass around the bridge with 14 ft width restrictment and 25
to 35 MPH SPEED limit. Work will last until October.
Width Restriction - 14
PCN - 16386

68.  US 281  BNSF RR SEPARATION AT NEW ROCKFORD - STRUCTURAL AND INCIDENTALS
US 281 from one mile south of New Rockford through New Rockford is
closed because of bridge replacement project. Traffic is detoured
around the project  on a bypass with a 14 ft. width restriction.Speed
is reduced to 25-35 MPH. Work will last into October
PCN - 15913

70.  US 2    JCT 85 E TO RAY-WB - THIN LIFT OVERLAY
Project is suspended.
PCN - 16339

71.  US 2    9 MI E STANLEY TO 12 MI W BRTHLD-4L - HOT BITUMINOUS SURFACING
Paving Miles 100-121 on eastbound rdwy. Flaggers used at median x-overs.
Be prepared to slow down in areas where flaggers are present
or trucks are entering. Mile 131, in westbound lanes, Lt. lane
closed; in eastbound lanes, traffic driving on temporary x-ing.
Speed limit  40 MPH in Mile 131.
PCN - 14793

72.  US 2    12 MI W BERTHOLD TO 2 MI W BRTHLD-4L - HOT BITUMINOUS SURFACING
Paving Miles 100-121 on eastbound rdwy. Flaggers used at median x-overs.
Be prepared to slow down in areas where flaggers are present
or trucks are entering. Mile 131, in westbound lanes, Lt. lane
closed; in eastbound lanes, traffic driving on temporary x-ing.
Speed limit 40 MPH in Mile 131.
PCN - 14791

73.  US 2    2 MI W BERTHOLD TO 3 MI W JCT 52-4L - HOT BITUMINOUS SURFACING
Paving Miles 100-121 on eastbound rdwy. Flaggers used at median x-overs.
Be prepared to slow down in areas where flaggers are present
or trucks are entering. Mile 131, in westbound lanes, Lt. lane
closed; in eastbound lanes, traffic driving on temporary x-ing.
Speed limit 40 MPH in Mile 131.
PCN - 14784

74.  US 52   FLAXTON OVERPASS - APPROACH SLAB PLACEMENT
Site is open to normal traffic
PCN - 16360

77.  US 83   MINOT-N BROADWAY (21ST TO 46TH AVE) - CHIP SEAL COAT
US 83 was fully open to traffic this week.  Whenever the Contractor
worked within the roadway, temporary traffic control devices
were used to direct traffic.
PCN - 17236

78.  US 83   MINOT N TO AIR FORCE BASE - NB/SB - CHIP SEAL COAT
US 83 was fully open to traffic this week.  When the Contractor was
working within the roadway, temporary traffic control devices
were used to direct traffic.
PCN - 17242

81.  I 29   ELM RIVER REST AREA PARKING LOTS N/S - HOT BITUMINOUS SURFACING
Both rest areas will remain closed throughout the duration of the
project - approximately 3 more weeks.
PCN - 16362

83.  ND 5    ICELANDIC STATE PARK/PEMBINA CTY - TURN LANES
Reduced speed in work zone at 40 mph with shoulders closed.  Trucks
entering highway at various locations throughout the day.
PCN - 17215

85.  ND 5    JCT US 52 TO W JCT 28 - CHIP SEAL COAT
Project is now complete.  There are no traffic delays.
PCN - 17238

86.  ND 5    W JCT 28 TO MOHALL - CHIP SEAL COAT
Project is now complete.  There are no traffic delays.
PCN - 17239

87.  ND 5    MOHALL TO W JCT US 83 - CHIP SEAL COAT
Project is now complete.  There are no traffic delays.
PCN - 17240

88.  US 81   LEVANT NW TO N EDGE OF ARDOCH - SLURRY SEAL
Slurry Seal complete.  Temporary striping in place.  Permanent striping
to be applied, tentatively, on the week of July 27th.
PCN - 17245

89.  ND 15   MCVILLE E TO JCT 32 - CHIP SEAL COAT
Fresh Oil/Loose Rock
PCN - 17250

90.  ND 28   MINOT DISTRICT HWYS 2-52-83-14-23-28 - INTERMITENT CONTRACT PATCHING
No Road Work Restrictions For This Project Until August
Width Restriction - 14
PCN - 17337

91.  ND 200  N JCT 32 AT FINLEY E TO JCT 18 - CHIP SEAL COAT
Traffic speeds normal. Project complete except for permanent striping.
PCN - 16894

92.  ND 11   JCT 1 E TO FORMAN - CHIP SEAL COAT
Seal Coat Operation has been completed.  Traffic Control Signs will
continue to slow traffic until permanent striping is installed.
 Please follow Speed Limit and Do Not Pass signs to avoid causing
rock chips.  We appreciate your patientience for one more week
until this project gets wrapped up.
PCN - 17257

93.  ND 30   JCT 66 N TO JCT 281 - THIN LIFT OVERLAY
Thin lift overlay on ND 30.  Starting 14 miles south of Rolla and
ending at Rolla, MP 181 to Mp 195. Construction is in progress.
 One lane traffic control by flaggers and pilot car. Expect 5 minute
to 10 minute delays.
Width Restriction - 14
PCN - 17322

94.  US 81   GRAFTON N TO NORTH JCT 66 - SLURRY SEAL
Construction complete.  Temporary striping in place.  Permanent striping
to be placed, tentatively, on the week of July 27th.
PCN - 17244

95.  I 94   NEAR US 281 E TO E BLOOM INTR-EB - CPR
Driving lane closed RP 258 to RP 263 east bound. Driving lane closed
RP 261 to RP 259 west bound. Expect reduced speeds when workers
present.
Width Restriction - 14
PCN - 16756

96.  ND 5    STATE LINE E TO W JCT 85 - CHIP SEAL COAT
project field work complete
PCN - 16913

97.  US 83   MINOT-BROADWAY (UNIV TO 21ST AVE N) - AGGREGATE BASE
All four lanes of traffic are open on North Broadway. Motorists can
expect temporary lane closures as crews finalize work. Access
to all avenues is open, and left turns are now allowed throughout
the project.
Width Restriction - 16
Height Restriction - 16
PCN - 16862

98.  US 12   HP TURNOUT AT REEDER - HOT BITUMINOUS SURFACING
Nothing Reported
PCN - 17291

99.  ND 67   SCRANTON N APPROX 16 MI - THIN LIFT OVERLAY
Construction is expected to begin October 6, 2008.
PCN - 16347

100. US 2    KNOX TO LEEDS-WB - SLURRY SEAL
Slurry Seal from Leeds to Knox, WB Lanes and medians.  Single Lane
closure,  Speeds reduced to 40 mph while workers present.  Work
scheduled to be  finished 7/25/08.  Fresh oil on roadway.   Flaggers
present to guide  traffic.
PCN - 17227

101. US 81   NORTH JCT 66 N TO JCT 5 AT HAMILTON - MINE AND BLEND
Road work on US 81 from the intersection on ND 66 near St. Thomas
to the intersection of ND 5 at Hamilton. Speeds will be reduced
to 55 MPH during work activity.
PCN - 13133

102. ND 91B  ST THOMAS SPUR - MILLING
Nothing Reported
PCN - 14060

103. ND 32   JCT ND 45 N TO JCT 15 - COLD-IN-PLACE RECYCLE
West lane closure from RP 140.042 to 140.506, flagger controled.
 Speeds reduced from 45 mph to 25mph within the immediate work zone.
 Stop and go traffic around the erosion control work area.
 East shldr is delineated with vertical panels due to stockpiling
erosion blankets in this location.
Width Restriction - 12
PCN - 16350

104. ND 1804 RP 267 TO RP 283.74 - THIN LIFT OVERLAY
Construction will begin on Monday July 21. There should be no width
restrictions. Traffic will be reduced to one lane with flaggers
and a pilot car. Traffic should expect delays. Construction should
take approximately 7 or 8 days days.
PCN - 17388

105. ND 32   JCT I-94 ORISKA N TO CO LN - THIN LIFT OVERLAY
Moving one-lane closure in place for milling & paving on mainline.
 Width restriction of 12'. Traffic controlled with reduced speeds,
flaggers & pilot car. Be prepared to stop.
Width Restriction - 12
PCN - 16356

106. ND 1    SD STATE LN N-E-N TO JCT 11 - CHIP SEAL COAT
Sealcoat project on ND 1 from Jct ND11 South of Oakes to state line.
 Fresh oil and loose rock.  Reduced speed limit to 40 MPH. Flaggers
and pilot car being used in work zone.
Width Restriction - 12
PCN - 17222

107. ND 1    OAKES N TO N JCT 13 - CHIP SEAL COAT
Sealcoat project on ND 1 from Verona Jct ND 13 to Oakes. Reduced
speed limit to 40 MPH in work zone. Fresh oil and loose rock. Flaggers
and pilot car being used in work zone.
Width Restriction - 12
PCN - 17223

108. ND 11   JCT 83 E TO CO LN - THIN LIFT OVERLAY
Nothing Reported
PCN - 16341

109. ND 11   CO LN E TO JCT 3 NORTH - THIN LIFT OVERLAY
Nothing Reported
PCN - 16344



Maintenance Activity Areas
7/25/2008


M-10.US 83   Crack Repair  Mile: 89 To Mile: 112
Bismarck Wilton
The Department will be microsurfacing depressed cracks.  The work
zone will be one to two miles in length and will start work at
Bismarck and proceed north to Wilton. Traffic will be divirted to
one lane near the work zone.

M-14.ND 1806 Chip Seal  Mile: 311.315 To Mile: 285.563
Junction 23 going north North end 1806 - Tobacco Gardens
Fresh oil, loose rock. Flaggers and pilot car present during work
hours. Speeds reduced to 45 mph.

M-16.ND 200  Crack Repair  Mile: 115.351 To Mile: 143.511
Jct 8 N of Halliday Jct 49 N of Beulah
Pilot car will guide motorists through the work area.  15 minute
delays.  Work will take place Monday through Thursday only.