ColorBlack & WhiteBismarckMinotFargoTextInteractive Map
Last updated at 7/25/2008 8:15:47 AM
Highway Construction Areas 7/25/2008 5. I 94 W FGO 9TH ST/I-94 SEPAR (SURCHARGE) - STRUCTURAL FILLS Barriers and attuneation devices are present. Speed limits normal. PCN - 16296 6. I 94 SE CASS DIKE INSTALLATION - STRUCTURAL FILLS No lane closures set up and speed limits are normal. Work done being done behind the barriers PCN - 17035 7. I 94B MANDAN-MAIN ST HEART RIVER BRIDGE - STRUCTURAL AND INCIDENTALS There is two lane traffic across the new Heart River Bridge on business loop I-94 at mile point 915.01. A 12' width restriction is still in effect. Overload permits will not be issued to cross this bridge. Width Restriction - 12 PCN - 16593 8. I 94B BISMARCK-MANDAN MEMORIAL BRIDGE - STRUCTURAL AND INCIDENTALS The SE Loop on the west Memorial Bridge Interchange to travel north to I-94 is now OPEN. The SE Ramp remains closed. A detour for the SE Ramp is in place using the McKenzie Drive Interchange and 46th Street in Mandan to get onto Memorial Highway. PCN - 13994 9. ND 294 FGO-12TH AVE N BNSF RAILROAD BRIDGE - STRUCTURAL WIDENINGS Speed limit on structure 25 MPH. Two way traffic on structure. One lane each direction. Width Restriction - 11 PCN - 14236 10. I 29 I-29 AT 52ND AVE S.-RAMP & STRUCTURE - RAMP REVISIONS I29 & 52 A Interchg; I29 SB single lane closure, 12' width, 3'shldr lt, 2' shldr rt, 16.2' height restr., exit traffic SB at 52 A use temp. loop RP 60.359. NB I29 single lane closure with 14' width plus 4' shldr rt, 16' height. NB I29 wide loads use ramp detour (overhd. 52 A.) RP 60.441 Width Restriction - 12 Height Restriction - 16 PCN - 12769 11. I 29 I-29 & 52ND AVE S NW & NE FRONT ROAD - AGGREGATE BASE 31st str. S.& 38th str. S. have been closed for reconstruction, north & south bound traffic will have to seek alternate routes. PCN - 17172 12. ND 23 WATFORD CITY SECTION - MILLING 4th Ave NE & Main Street thru Watford City are under construction. Eastbound traffic off Hwy 85 should take the Hwy 23 truck route. Westbound traffic off Hwy 23 should take the Hwy 23 truck route. Expect truck traffic, construction equipment and detours. PCN - 15926 13. I 94 BUFFALO TO WHEATLAND-EB - PCC PAVEMENT I94 EB from RP 315 (Buffalo Int.) to RP 323 closed - traffic head to head on WB roadway. At Absaraka - Exit 322 the bridge & all ramps are closed. At Ayr Exit 317 - the S ramps are closed to the public & the crossroad has single lane traffic over the bridge. Width Restriction - 14 Height Restriction - 15.5 PCN - 13476 15. US 81B FARGO-52ND AVE S (I-29 TO UNIV DR) - GRADE Jersey Barriers have been installed on both shoulders thru a 300 ft construction zone on 52nd Ave S, from 31st St to 25th St. The maximum lane width is 11ft. 52nd Ave is closed from 25th Street to University Dr. The traffic on 52nd Ave is detoured around on 25th St to 58th Ave to University Dr. Width Restriction - 11 Height Restriction - 11 PCN - 15186 16. US 83 MINOT-BROADWAY(4TH AVE - UNIVERSITY) - AGGREGATE BASE Head To Head Traffic On Broadway From Central Ave. To University Ave. Head To Head Traffic On 4th Ave From Broadway To 4th St. Width Restriction - 11 Height Restriction - 17 PCN - 15182 17. I 94 NEAR SOUTH HEART TO W.DICK INTCHG-EB - PCC PAVEMENT WESTBOUND: Two-way traffic on this roadway. Speed limit is 40 mph on entering and exiting two-way traffic set up, otherwise 65 mph. Width restrictions of 18 ft for westbound traffic and 14 ft for eastbound traffic are in place. EASTBOUND: Traffic is head-to-head on the westbound roadway. PCN - 14701 18. I 29 BNSF RR SEP & WILD RICE RIV-NB - BRIDGE DECK OVERLAY NORTHBOUND I-29 will be reduced to a single lane at RP 33 (Bridge over BNSF Tracks) and 42 (Bridge over Wild Rice River). Speed will be reduced to 40 mph during working hours. Width restriction of 17'. If flagger is present speeds will be reduced to 25MPH. Width Restriction - 17 PCN - 16758 19. US 2 BERWICK TO 1 MI W RUGBY-WB - WIDENING Westbound Lane closed from MP 201.42 to 209.66. Two Lane Traffic, speeds reduced 60 MPH. Width Restriction - 12 PCN - 15903 20. US 81 NORTH JCT 66 N TO JCT 5 AT HAMILTON - GRADE Road work on US 81 from the intersection on ND 66 near St. Thomas to the intersection of ND 5 at Hamilton. Speeds will be reduced to 55 MPH during work activity. PCN - 13132 22. I 94 GRANT MARSH BRIDGE - PREVENTIVE MAINTENANCE This project has no effect on traffic. PCN - 16863 24. ND 41 RR UNDERPASS RP 73.417 TO 73.498 - DRAINAGE IMPROVEMENTS Hwy 41 is reduced to one lane traffic through the underpass in the city of Velva. Traffic being controlled with a temporary traffic signal system. Width Restriction - 12 Height Restriction - 14.58 PCN - 15936 25. I 94 YOUNGMANS BUTTE-2 MI W EAGLES NEST-W - HOT BITUMINOUS SURFACING Expect short areas of reduced speed and shoulder closures on the Eastbound and Westbound roadways. Construction equipment will be working in the north ditch. PCN - 16270 26. ND 200 JCT 49 E TO W END OF HAZEN - GRADE Expect 10 -15 minute delays. Flaggers and pilot cars will control traffic during working hours. The speed limit is 25 MPH thru the construction area and traffic will be on a gravel surface for the remainder of the summer. No overweight vehicles allowed due to the soft subgrade. PCN - 15919 27. I 29 4 SITES 0N I-29 IN GF DISTRICT - APPROACH SLAB REPAIR Lane closure in NB roadway from south of Demers Ave. to north of Gateway Drive. Lane closure in SB roadway at Demers Ave. Interchange (Exit 140) at Grand Forks. Speed reduced. Flaggers may be present during working hours. Width Restriction - 15 PCN - 16375 28. ND 32 US 2 NORTH TO CO LN - HOT BITUMINOUS SURFACING Contractor is paving mainline. Traffic is being directed by flaggers and pilot car, expect 10 minute delays. PCN - 12519 29. ND 32 CO LN N TO JCT 17 - HOT BITUMINOUS SURFACING Contractor is paving mainline. Traffic is being directed by flaggers and pilot car, expect 10 minute delays. PCN - 17096 30. ND 200 HILLSBORO - CURB & GUTTER ND 200 is closed through Hillsboro. Traffic is being detoured onto Interstate 29 from exit 100 to exit 111. PCN - 16592 31. ND 200 CITY OF HILLSBORO (SANITARY SEWER) - STORM SEWER Highway 200 closed from Caledonia to North edge of Hillsboro PCN - 17214 32. ND 1806 MANDAN-MANDAN AVE NE (MAIN TO I-94) - AGGREGATE BASE Mandan Ave reduce to one lane one way road. Traffic is only allowed south bound. North bound traffic not allowed. North bound detour signs in place. Access to business from 13th ave. Main Street is reduced to one lane traffic in each direction between Twin City Drive and Mandan Ave Width Restriction - 12 PCN - 15887 33. ND 25 CENTER - HOT BITUMINOUS SURFACING All work at this time will be off road. Equipment will be working on the shoulder of the roadway. Construction signing and flaggers will be used as needed. The posted speed limit is 25 MPH. PCN - 16595 34. ND 25 CENTER W TO JCT 31-HANNOVER - FULL DEPTH RECLAMATION Initially all work will be off road but equipment and vehicles may be near or crossing the roadway. Shoulder work signs will be in place. Caution is advised in areas where work is in progress. Flaggers will be present as needed. PCN - 16342 36. US 2 US 2 AND GF CO RD 4A-WB - GRADE Traffic is running head-to-head on the eastbound roadway from RP 331.24 to 333.23. Speeds reduced to 60 MPH on the eastbound roadway, and 40 MPH on the median crossover transitions. Flaggers may be present at times to further reduce speed where workers are present. Width Restriction - 12 PCN - 17003 37. US 2 1.4 MI W JCT 18 E TO 1 MI W GF AFB-E - THIN LIFT OVERLAY Traffic is running head-to-head on the eastbound roadway from RP 331.24 to 333.23 (For WB project). Speeds reduced to 60 MPH on the eastbound roadway, and 40 MPH on the median crossover transitions. Flaggers may be present at times to further reduce speed where workers are present. Width Restriction - 12 PCN - 16798 39. I 94 CRYSTAL SPRINGS TO STREETER-WB - CPR W Bound I-94 driving lane closed from RP 219 to 229. Speeds reduced when workers present. Width Restriction - 14 PCN - 13470 40. ND 1 NEKOMA SPUR N TO JCT 5-LANGDON - GRADE Work continues on both shoulders and in the east ditch along the urban portion of the construction zone. PCN - 16407 41. ND 5 JCT 1-LANGDON-E TO END PCC - CRACK AND SEAT Watch for people unloading concrete pipe along the shoulder of the road. PCN - 16345 44. I 29 BOWESMONT TO CANADIAN LINE - SELECTIVE GRADING NB traffic reduced to 55mph on I-29 from N. Bowes. Sep. RP 197, to Joliette Int. RP 206. NB traffic at the Joliette Int., Bathgate Int., & Neche Int. will be detoured to the interchange ramps going N. The Joliette Int. bridge is closed, E & W traffic is detoured to the next N or S interchange. Width Restriction - 20 PCN - 15924 45. I 29 BOWESMONT INTR TO BATHGATE SEP-NB - MILLING NB traffic reduced to 55mph on I-29 from N. Bowes. Sep. RP 197, to Joliette Int. RP 206. NB traffic at the Joliette Int., Bathgate Int., & Neche Int. will be detoured to the interchange ramps going N. The Joliette Int. bridge is closed, E & W traffic is detoured to the next N or S interchange. Width Restriction - 20 PCN - 16850 46. I 29 NORTH BOWESMONT SEP & JOLIETTE - STRUCTURAL AND INCIDENTALS NB traffic reduced to 55mph on I-29 from N. Bowes. Sep. RP 197, to Joliette Int. RP 206. NB traffic at the Joliette Int., Bathgate Int., & Neche Int. will be detoured to the interchange ramps going N. The Joliette Int. bridge is closed, E & W traffic is detoured to the next N or S interchange. Width Restriction - 20 PCN - 15319 48. US 281 JCT 200-CARRINGTON-TO S JCT 15 - BLENDED BITUMINOUS BASE US 281 from Carrington north 13 miles to jct of 1 ND15.Shoulder and inslope reconstruction,speed reduced to 45 in work area which is two to three miles long.Traffic controlled by pilot car & flaggers. speed 55 in other areas. Can expext 15 minn delay. PCN - 16385 53. ND 11 HANKINSON E TO I-29 - WIDENING 40 mph speed limit. Flaggers control traffic to one lane. Shoulders drop-off on both sides of road. PCN - 16803 54. ND 8 JCT 23-E NEW TOWN-N TO STANLEY - CHIP SEAL COAT Seal coat application in Miles 132 to 156 has been completed. Speed limit 65 MPH. PCN - 17254 55. ND 8 NORTHEAST OF NEW TOWN - STRUCTURAL AND INCIDENTALS Working in ditches along both sides of roadway in Miles 137 to 139. Temporary bypass open in Mile 138; speed limit 25 MPH in this area. Width Restriction - 30 PCN - 14757 56. I 94B MANDAN-MAIN ST(HEART RIVER TO ND 6) - GRADE There is two lane traffic across the new Heart River Bridge on business loop I-94 from the intersection of Highway 6 to the west side of the heart river bridge. A 12' width restriction is still in effect. Overload permits will not be issued to cross this bridge. Width Restriction - 12 PCN - 16594 63. ND 18 ND18 - BLANCHARD TO MAYVILLE - THIN LIFT OVERLAY Speeds are normal no delays present work is completed. PCN - 16844 67. US 281 S JCT ND 15 TO N JCT ND 15 - THIN LIFT OVERLAY US 281 from S Jct of ND 15 to N Jct. ND 15. Through New Rockford has bridge that is closed for replacement. Traffic will use a oiled bypass around the bridge with 14 ft width restrictment and 25 to 35 MPH SPEED limit. Work will last until October. Width Restriction - 14 PCN - 16386 68. US 281 BNSF RR SEPARATION AT NEW ROCKFORD - STRUCTURAL AND INCIDENTALS US 281 from one mile south of New Rockford through New Rockford is closed because of bridge replacement project. Traffic is detoured around the project on a bypass with a 14 ft. width restriction.Speed is reduced to 25-35 MPH. Work will last into October PCN - 15913 70. US 2 JCT 85 E TO RAY-WB - THIN LIFT OVERLAY Project is suspended. PCN - 16339 71. US 2 9 MI E STANLEY TO 12 MI W BRTHLD-4L - HOT BITUMINOUS SURFACING Paving Miles 100-121 on eastbound rdwy. Flaggers used at median x-overs. Be prepared to slow down in areas where flaggers are present or trucks are entering. Mile 131, in westbound lanes, Lt. lane closed; in eastbound lanes, traffic driving on temporary x-ing. Speed limit 40 MPH in Mile 131. PCN - 14793 72. US 2 12 MI W BERTHOLD TO 2 MI W BRTHLD-4L - HOT BITUMINOUS SURFACING Paving Miles 100-121 on eastbound rdwy. Flaggers used at median x-overs. Be prepared to slow down in areas where flaggers are present or trucks are entering. Mile 131, in westbound lanes, Lt. lane closed; in eastbound lanes, traffic driving on temporary x-ing. Speed limit 40 MPH in Mile 131. PCN - 14791 73. US 2 2 MI W BERTHOLD TO 3 MI W JCT 52-4L - HOT BITUMINOUS SURFACING Paving Miles 100-121 on eastbound rdwy. Flaggers used at median x-overs. Be prepared to slow down in areas where flaggers are present or trucks are entering. Mile 131, in westbound lanes, Lt. lane closed; in eastbound lanes, traffic driving on temporary x-ing. Speed limit 40 MPH in Mile 131. PCN - 14784 74. US 52 FLAXTON OVERPASS - APPROACH SLAB PLACEMENT Site is open to normal traffic PCN - 16360 77. US 83 MINOT-N BROADWAY (21ST TO 46TH AVE) - CHIP SEAL COAT US 83 was fully open to traffic this week. Whenever the Contractor worked within the roadway, temporary traffic control devices were used to direct traffic. PCN - 17236 78. US 83 MINOT N TO AIR FORCE BASE - NB/SB - CHIP SEAL COAT US 83 was fully open to traffic this week. When the Contractor was working within the roadway, temporary traffic control devices were used to direct traffic. PCN - 17242 81. I 29 ELM RIVER REST AREA PARKING LOTS N/S - HOT BITUMINOUS SURFACING Both rest areas will remain closed throughout the duration of the project - approximately 3 more weeks. PCN - 16362 83. ND 5 ICELANDIC STATE PARK/PEMBINA CTY - TURN LANES Reduced speed in work zone at 40 mph with shoulders closed. Trucks entering highway at various locations throughout the day. PCN - 17215 85. ND 5 JCT US 52 TO W JCT 28 - CHIP SEAL COAT Project is now complete. There are no traffic delays. PCN - 17238 86. ND 5 W JCT 28 TO MOHALL - CHIP SEAL COAT Project is now complete. There are no traffic delays. PCN - 17239 87. ND 5 MOHALL TO W JCT US 83 - CHIP SEAL COAT Project is now complete. There are no traffic delays. PCN - 17240 88. US 81 LEVANT NW TO N EDGE OF ARDOCH - SLURRY SEAL Slurry Seal complete. Temporary striping in place. Permanent striping to be applied, tentatively, on the week of July 27th. PCN - 17245 89. ND 15 MCVILLE E TO JCT 32 - CHIP SEAL COAT Fresh Oil/Loose Rock PCN - 17250 90. ND 28 MINOT DISTRICT HWYS 2-52-83-14-23-28 - INTERMITENT CONTRACT PATCHING No Road Work Restrictions For This Project Until August Width Restriction - 14 PCN - 17337 91. ND 200 N JCT 32 AT FINLEY E TO JCT 18 - CHIP SEAL COAT Traffic speeds normal. Project complete except for permanent striping. PCN - 16894 92. ND 11 JCT 1 E TO FORMAN - CHIP SEAL COAT Seal Coat Operation has been completed. Traffic Control Signs will continue to slow traffic until permanent striping is installed. Please follow Speed Limit and Do Not Pass signs to avoid causing rock chips. We appreciate your patientience for one more week until this project gets wrapped up. PCN - 17257 93. ND 30 JCT 66 N TO JCT 281 - THIN LIFT OVERLAY Thin lift overlay on ND 30. Starting 14 miles south of Rolla and ending at Rolla, MP 181 to Mp 195. Construction is in progress. One lane traffic control by flaggers and pilot car. Expect 5 minute to 10 minute delays. Width Restriction - 14 PCN - 17322 94. US 81 GRAFTON N TO NORTH JCT 66 - SLURRY SEAL Construction complete. Temporary striping in place. Permanent striping to be placed, tentatively, on the week of July 27th. PCN - 17244 95. I 94 NEAR US 281 E TO E BLOOM INTR-EB - CPR Driving lane closed RP 258 to RP 263 east bound. Driving lane closed RP 261 to RP 259 west bound. Expect reduced speeds when workers present. Width Restriction - 14 PCN - 16756 96. ND 5 STATE LINE E TO W JCT 85 - CHIP SEAL COAT project field work complete PCN - 16913 97. US 83 MINOT-BROADWAY (UNIV TO 21ST AVE N) - AGGREGATE BASE All four lanes of traffic are open on North Broadway. Motorists can expect temporary lane closures as crews finalize work. Access to all avenues is open, and left turns are now allowed throughout the project. Width Restriction - 16 Height Restriction - 16 PCN - 16862 98. US 12 HP TURNOUT AT REEDER - HOT BITUMINOUS SURFACING Nothing Reported PCN - 17291 99. ND 67 SCRANTON N APPROX 16 MI - THIN LIFT OVERLAY Construction is expected to begin October 6, 2008. PCN - 16347 100. US 2 KNOX TO LEEDS-WB - SLURRY SEAL Slurry Seal from Leeds to Knox, WB Lanes and medians. Single Lane closure, Speeds reduced to 40 mph while workers present. Work scheduled to be finished 7/25/08. Fresh oil on roadway. Flaggers present to guide traffic. PCN - 17227 101. US 81 NORTH JCT 66 N TO JCT 5 AT HAMILTON - MINE AND BLEND Road work on US 81 from the intersection on ND 66 near St. Thomas to the intersection of ND 5 at Hamilton. Speeds will be reduced to 55 MPH during work activity. PCN - 13133 102. ND 91B ST THOMAS SPUR - MILLING Nothing Reported PCN - 14060 103. ND 32 JCT ND 45 N TO JCT 15 - COLD-IN-PLACE RECYCLE West lane closure from RP 140.042 to 140.506, flagger controled. Speeds reduced from 45 mph to 25mph within the immediate work zone. Stop and go traffic around the erosion control work area. East shldr is delineated with vertical panels due to stockpiling erosion blankets in this location. Width Restriction - 12 PCN - 16350 104. ND 1804 RP 267 TO RP 283.74 - THIN LIFT OVERLAY Construction will begin on Monday July 21. There should be no width restrictions. Traffic will be reduced to one lane with flaggers and a pilot car. Traffic should expect delays. Construction should take approximately 7 or 8 days days. PCN - 17388 105. ND 32 JCT I-94 ORISKA N TO CO LN - THIN LIFT OVERLAY Moving one-lane closure in place for milling & paving on mainline. Width restriction of 12'. Traffic controlled with reduced speeds, flaggers & pilot car. Be prepared to stop. Width Restriction - 12 PCN - 16356 106. ND 1 SD STATE LN N-E-N TO JCT 11 - CHIP SEAL COAT Sealcoat project on ND 1 from Jct ND11 South of Oakes to state line. Fresh oil and loose rock. Reduced speed limit to 40 MPH. Flaggers and pilot car being used in work zone. Width Restriction - 12 PCN - 17222 107. ND 1 OAKES N TO N JCT 13 - CHIP SEAL COAT Sealcoat project on ND 1 from Verona Jct ND 13 to Oakes. Reduced speed limit to 40 MPH in work zone. Fresh oil and loose rock. Flaggers and pilot car being used in work zone. Width Restriction - 12 PCN - 17223 108. ND 11 JCT 83 E TO CO LN - THIN LIFT OVERLAY Nothing Reported PCN - 16341 109. ND 11 CO LN E TO JCT 3 NORTH - THIN LIFT OVERLAY Nothing Reported PCN - 16344 Maintenance Activity Areas 7/25/2008 M-10.US 83 Crack Repair Mile: 89 To Mile: 112 Bismarck Wilton The Department will be microsurfacing depressed cracks. The work zone will be one to two miles in length and will start work at Bismarck and proceed north to Wilton. Traffic will be divirted to one lane near the work zone. M-14.ND 1806 Chip Seal Mile: 311.315 To Mile: 285.563 Junction 23 going north North end 1806 - Tobacco Gardens Fresh oil, loose rock. Flaggers and pilot car present during work hours. Speeds reduced to 45 mph. M-16.ND 200 Crack Repair Mile: 115.351 To Mile: 143.511 Jct 8 N of Halliday Jct 49 N of Beulah Pilot car will guide motorists through the work area. 15 minute delays. Work will take place Monday through Thursday only.