HIGHWAY: 94
PROJECT_DESC: MANDAN-MAIN ST HEART RIVER BRIDGE
COMMENTS: There is two lane traffic across the new Heart River Bridge on business loop I-94 at mile point 915.01. A 12' width restriction is still in effect. Overload permits will not be issued to cross this bridge.
WIDTH_RESTRICTION: 12
HIGHWAY: 94
PROJECT_DESC: GRANT MARSH BRIDGE
COMMENTS: This project has no effect on traffic.
HIGHWAY: 94
PROJECT_DESC: BISMARCK-MANDAN MEMORIAL BRIDGE
COMMENTS: The SE Loop on the west Memorial Bridge Interchange to travel north to I-94 is now OPEN. The SE Ramp remains closed. A detour for the SE Ramp is in place using the McKenzie Drive Interchange and 46th Street in Mandan to get onto Memorial Highway.
HIGHWAY: 94
PROJECT_DESC: MANDAN-MAIN ST(HEART RIVER TO ND 6)
COMMENTS: There is two lane traffic across the new Heart River Bridge on business loop I-94 from the intersection of Highway 6 to the west side of the heart river bridge. A 12' width restriction is still in effect. Overload permits will not be issued to cross this bridge.
WIDTH_RESTRICTION: 12
HIGHWAY: 1806
PROJECT_DESC: MANDAN-MANDAN AVE NE (MAIN TO I-94)
COMMENTS: Mandan Ave reduce to one lane one way road. Traffic is only allowed south bound. North bound traffic not allowed. North bound detour signs in place. Access to business from 13th ave. Main Street is reduced to one lane traffic in each direction between Twin City Drive and Mandan Ave
WIDTH_RESTRICTION: 12
HIGHWAY: 83
WIDTH_RESTRICTION:
HEIGHT_RESTRICTION:
PROJECT_DESCRIPTION: The Department will be microsurfacing depressed cracks. The work zone will be one to two miles in length and will start work at Bismarck and proceed north to Wilton. Traffic will be divirted to one lane near the work zone.
DESCRIPTION: Crack Repair
nd.gov - The Official Portal for North Dakota State Government
North Dakota: Legendary. Follow the trail of legends
Department of Transportation
North Dakota